Skip to main content
Skip table of contents

Adjustments from P1 loadbalancing to FlexiO control

In these specific situations the Alfen charger was already installed at the customer and Alfen’s loadbalancing is done via the P1 port of the digital meter.

The charger is physically connected by UTP to the digital meter. This connection is no longer necessary. Loadbalancing will be managed by LIFEPOWR through the connection between FlexiObox and digital meter. For FlexiO to control the charger, the charger needs to be connected to the local network. A new UTP cable has to be installed between the Alfen charger and router.

In case of digital meter and router being in the same area, the existing UTP can be re-used by changing the connector from RJ11 (digital meter) to RJ45 (router).

Configuration of FlexiO requires that the modbus communication is enabled in each individual charger’s settings, the procedure can be executed locally (via MyEve app or ACE Service Installer) or remotely (via Backoffice).

For details on potential issues, check the Alfen Troubleshooting Guide.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.