Steps to configure Huawei EMMA
Requirements:
-
Installer access to EMMA
-
EMMA connected to the same network as the FlexIObox
Enable Modbus TCP
-
Open the Fusion Solar App and login on the EMMA device with the installer credentials.
-
Navigate to the following path: Services > Commission the device > Communication Settings > Modbus TCP, then:
-
Enable "Connection"
-
Disable "TLS"
-
Make sure the "Client IP Address" is set to 0.0.0.0
-
Enable charge from grid
-
Navigate to the following path: Services > Commission the device > Power adjustment, then:
-
Enable "Charge from AC"
-
Set the "Maximum charge power of grid" to the desired value (e.g., 20kW)
-